loader

World Tenders & Procurement Opportunities

Supplying Necessary spare parts and machining works for repairing the propulsion unit and gearbox of Doosan Engine of Ferry Utility Type egp-66/FDK/2026-2027 - 2012803

World Biggest Tenders Source

This tender with title Supplying Necessary spare parts and machining works for repairing the propulsion unit and gearbox of Doosan Engine of Ferry Utility Type egp-66/FDK/2026-2027 - 2012803 has been published on Bidding Source portal dated 04 Nov 2026 for the country of Bangladesh. It has been categorized on Mechanical excavators. For similar tenders you can see tenders mentioned below of this page.

General Information

Supplying Necessary spare parts and machining works for repairing the propulsion unit and gearbox of Doosan Engine of Ferry Utility Type egp-66/FDK/2026-2027 - 2012803
Invitation for Bids
2012803
Bangladesh
4 Nov 2026
12 Nov 2026
English
Mechanical excavators

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Repair and ancillary work including supply of parts for the driving system, chain, Bucket, Auto electric system, Engine, Hydraulic System, Entire body and Pontoon for Amphibian Excavator EE/Store/OTM-01/Works/2026-2027 - 2012743 Bangladesh Dyke construction by Earth work by Mechanical Excavator ( Long Boom ) for 1st Dyke of Char of Noakhali zila, companygonj Upazila choto feni river under Narayanganj Dredger Operation Division… - NDOD/Feni River/Ancillary/OTM-04/2024-25/279 Bangladesh KDD/OTM-20/2021-22 Earth work (14400 Cum) by Mechanical Excavator (Long Boom ) in constructing/ resectioning of embankment/ canal bank/road etc. with clayey soil (minimum 30% clay, 0-40% silt and 0-30% sand) within the initial lead of 30m, and all lifts including throwing the spoils to profiles in layers not exceeding 150mm in thickness, clod breaking upto a maximum size of 100mm, benching the side slopes, stripping/ ploughing the base of embankment and borrow pit area, dug bailing, cutting trees upto 200mm girth, with uprooting stumps, clearing jungles, rough dressing and 150mm cambering at the centre of the crest etc. complete as per specification and direction of Engineer in charge & Construction and dismanteling of outlet (2 each) for dumping and disposal of water from disposal area by shore pipe by using necessary gunny bags, rope, wire, polytheen, rubber gasket, nut-bolt etc. complete as per direction of engineering in charge for Dredging work of Salamatpur at Faridpur Modukhali, Kamarkhali,from Km. 0.00 to 1.30 Km Under Khulna Dredger Operation Division ,BWDB, Lobonchora, Khulna During Year 2021-22. Bangladesh XEN/KDD/OTM-02/2020-21 Dyke Construction Work by Mechanical Excavator For Dredging works Of Tentulia River Char Dredging at Sreepur Mehendigong Barisal From Km 0.950 To Km 2.200 1.250 km 2nd Stage Group No D/1 Under Khulna Dredger Division BWDB Labonchara Khulna During The Year 2020-21. Bangladesh XEN/KDD/OTM-03/2020-21 Dyke Construction Work by Mechanical Excavator For Dredging works Of Tentulia River Char Dredging at Sreepur Mehendigong Barisal From Km 0.950 To Km 2.200 1.250 km 2nd Stage Group No D/2 Under Khulna Dredger Division BWDB Labonchara Khulna During The Year 2020-21. Bangladesh XEN/KDD/OTM-30/2019-20 Dyke Construction Work by Mechanical Excavator for Dredging works Of Borni Baor Tungipara Gopalgong From Km 2.200 To Km 4.700 2.500 k m Left Dyke From 2.200 km to 3.450 km Group No- D/02 Under Khulna Dredger Division BWDB Labonchara Khulna During The Year 2019-20 & 2020-21 Bangladesh XEN/KDD/OTM-31/2019-20 Dyke Construction Work by Mechanical Excavator for Dredging works Of Borni Baor Tungipara Gopalgong From Km 2.200 To Km 4.700 2.500 k m Left Dyke From 3.450 km to 4.700km Group No- D/03 Under Khulna Dredger Division BWDB Labonchara Khulna During The Year 2019-20 & 2020-21 Bangladesh XEN/KDD/OTM-30/2019-20 Dyke Construction Work by Mechanical Excavator for Dredging works Of Borni Baor Tungipara Gopalgong From Km 2.200 To Km 4.700 2.500 k m Left Dyke From 2.200 km to 3.450 km Group No- D/02 Under Khulna Dredger Division BWDB Labonchara Khulna During The Year 2019-20 & 2020-21 Bangladesh XEN/KDD/OTM-29/2019-20 Dyke Construction Work by Mechanical Excavator for Dredging works Of Borni Baor Tungipara Gopalgong From Km 2.200 To Km 4.700 2.500 k m Right Dyke Group No- D/01 Under Khulna Dredger Division BWDB Labonchara Khulna During The Year 2019-20 & 2020-21. Bangladesh Procurement of different types of filter and Bucket teeth for BIWTA Excavator-01,02 & 03 Bangladesh
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans