loader

World Tenders & Procurement Opportunities

Wykonanie raportu o oddziaływaniu na środowisko wraz z uzyskaniem decyzji o środowiskowych uwarunkowaniach dla przedsięwzięcia pn. Budowa linii 400 kV Dunowo – Żydowo Kierzkowo – Piła Krzewina

World Biggest Tenders Source

This tender with title Wykonanie raportu o oddziaływaniu na środowisko wraz z uzyskaniem decyzji o środowiskowych uwarunkowaniach dla przedsięwzięcia pn. Budowa linii 400 kV Dunowo – Żydowo Kierzkowo – Piła Krzewina -- Environmental impact assessment for construction has been published on Bidding Source portal dated 13 Oct 2020 for the country of Poland. It has been categorized on Environmental impact assessment for construction. For similar tenders you can see tenders mentioned below of this page.

Environmental impact assessment for construction

General Information

Wykonanie raportu o oddziaływaniu na środowisko wraz z uzyskaniem decyzji o środowiskowych uwarunkowaniach dla przedsięwzięcia pn. Budowa linii 400 kV Dunowo – Żydowo Kierzkowo – Piła Krzewina
Environmental impact assessment for construction
Invitation for Bids
2020/S 198-481076
Poland
Poland-Konstancin-Jeziorna
13 Oct 2020
19 Nov 2020
English
Environmental impact assessment for construction

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Preparation of a draft forest management plan together with a nature conservation program and a forecast of the impact of the plan on the environment and Natura 2000 areas for 9 forest districts - in force from 2027 - 668964 Poland Performing investor supervision over the design and implementation of the task: "Design and construction of devices limiting the acoustic impact on the environment of sections of the S7 and S8 roads, divided into sections: Section 1: S7 from the end of the Radom bypass to the border of the Mazovian Voivodeship; Section 2: S8 from Radziejowice to the border of the Mazovian Voivodeship, with the replacement of window joinery in a residential building" Poland Supervision of construction work - Performing investor supervision over the design and implementation of the task: "Design and construction of devices limiting the acoustic impact on the environment of sections of the S7 and S8 roads, divided into sections: Section 1: S7 from the end of the Radom bypass to the border of the Masovian Voivodeship; Section 2: S8 from Radziejowice to the border of the Masovian Voivodeship, with replacement of window joinery in a residential building Poland Display screens – Delivery of devices for protective technology systems. - 266230-2024 Poland Work environment services - Providing services related to the measurement of factors harmful to health in the work environment (including hygienic assessment), measurements of concentrations of elements or chemical compounds at the workstations of the underground and surface crew of PGG SA Branches, divided into two tasks: Task No. 1: measurements for underground stations Task No. 2: measurements for surface stations - 256745-2024 Poland Noise control services – Post-implementation analyzes of the environmental impact of completed projects involving the construction of the S61 expressway, divided into tasks - 246748-2024 Poland Work environment services - Providing services related to the measurement of factors harmful to health in the work environment (including hygienic assessment), measurements of concentrations of elements or chemical compounds at the workstations of the underground and surface crew of PGG SA Branches, divided into two tasks: Task No. 1: measurements for underground stations Task No. 2: measurements for surface stations - 250496-2024 Poland Market research services – Preparation of the study "Forecast of the environmental impact of the draft Development Strategy of the Lower Silesian Voivodeship 2030+" - 191552-2024 Poland Poland – Feasibility study, advisory service, analysis – Preparation of a Feasibility Study (together with CBA) together with a Report on the environmental impact of the project, a Report on the disposal of spoil into the sea and auxiliary studies for the Investment entitled "Conducting works to enable water transport to the Outer Port in Świnoujście." - 86585-2024 Poland Feasibility study, advisory service, analysis - Preparation of a Feasibility Study (together with CBA) together with a Report on the environmental impact of the project, a Report on the disposal of spoil into the sea and auxiliary studies for the Investment entitled "Conducting works to enable water transport to the Outer Port in Świnoujście." - 86585-2024 Poland
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans