loader

World Tenders & Procurement Opportunities

The package is focused on works: Improving the reliability of power supply of the medium voltage electrical network in Lai Chau city and Sin Ho district, according to the multi-division - multi-connection method; Install compensation capacitors on medium voltage grid by 2020

World Biggest Tenders Source

This tender with title The package is focused on works: Improving the reliability of power supply of the medium voltage electrical network in Lai Chau city and Sin Ho district, according to the multi-division - multi-connection method; Install compensation capacitors on medium voltage grid by 2020 -- Gói thầu tập trung thuộc các công trình: Nâng cao độ tin cậy cung cấp điện của lưới điện trung áp khu vực thành phố Lai Châu và huyện Sìn Hồ, theo phương pháp đa chia - đa nối; Lắp đặt tụ bù trên lưới điện trung áp năm 2020 has been published on Bidding Source portal dated 08 Dec 2020 for the country of Vietnam. It has been categorized on Electrical engineering installation works & Medium-voltage installation work & Medium-voltage equipment & Electrical installation work & Fixed capacitors & Variable or adjustable capacitors & Power supply accessories & Installation services of electrical and mechanical equipment & Electrical capacitors & Parts of electrical capacitors & Electrical services & Ancillary works for electricity power lines. For similar tenders you can see tenders mentioned below of this page.

Gói thầu tập trung thuộc các công trình: Nâng cao độ tin cậy cung cấp điện của lưới điện trung áp khu vực thành phố Lai Châu và huyện Sìn Hồ, theo phương pháp đa chia - đa nối; Lắp đặt tụ bù trên lưới điện trung áp năm 2020

General Information

The package is focused on works: Improving the reliability of power supply of the medium voltage electrical network in Lai Chau city and Sin Ho district, according to the multi-division - multi-connection method; Install compensation capacitors on medium voltage grid by 2020
Gói thầu tập trung thuộc các công trình: Nâng cao độ tin cậy cung cấp điện của lưới điện trung áp khu vực thành phố Lai Châu và huyện Sìn Hồ, theo phương pháp đa chia - đa nối; Lắp đặt tụ bù trên lưới điện trung áp năm 2020
Invitation for Bids
20201227839 - 00
Vietnam
8 Dec 2020
29 Dec 2020
Vietnamese
Electrical engineering installation works , Medium-voltage installation work , Medium-voltage equipment , Electrical installation work , Fixed capacitors , Variable or adjustable capacitors , Power supply accessories , Installation services of electrical and mechanical equipment , Electrical capacitors , Parts of electrical capacitors , Electrical services , Ancillary works for electricity power lines

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Supply and installation of equipment for the Operation Center - 9000160 -- Construction of the Transmission Grid Operation Monitoring Center at Power Transmission Company 1 Vietnam Construction of projects to install controlled switching equipment on the medium voltage grid of Bac Tu Liem district in 2025 - Installing capacitor bank switching equipment with SCADA function on the medium voltage line of Bac Tu - 7999388 Vietnam Construction and installation of 110kV power lines and underground cables - 110kV output after 220kV Duong Kinh substation connects 110kV Dong Hoa - Dinh Vu line - 7999509 Vietnam Investment project to construct the Administrative - Research Block QT.A1 under the QG-HCM-10 component project - Construction and completion of works and installation of light electrical equipment - 2000750 Vietnam Improving the power supply capacity of the low-voltage grid in the wards of Dinh Cong, Tuong Mai, Giap Bat, Thinh Liet, Hoang Liet, Linh Nam, Mai Dong in Hoang Mai district in 2026 - Construction - 2000753 Vietnam Improving the power supply capacity of low-voltage grid in Van and Vuc villages by 2026 - Construction - 2000903 Vietnam Package 04 – 26 “Medium voltage equipment and accessories of all kinds” - Package 04 – 26 “Medium voltage equipment and accessories of all kinds” - 2000824 Vietnam Improving the power supply capacity of low-voltage grid in Vinh Ninh village in 2026 - Construction - 2000906 Vietnam 110kV Power Line and Substation Nam Thanh Pho, Lao Cai Province - Construction and installation of 110kV power lines and transformer stations - 2000833 Vietnam Survey consultancy 02- DTXD 2026 - 1. Improving the power supply capacity of the low-voltage grid in Long Bien district in 2026 (wards of Ngoc Lam, Ngoc Thuy, Phuc Loi, Sai Dong, Long Bien); 2. Improving the power supply capacity of medium-voltage lines in Long Bien district in 2026.... - 89000690 Vietnam
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans