loader

World Tenders & Procurement Opportunities

Approving the contractor selection plan for the Dredging and Maintenance of Wharf water area, Regional Center for Maritime Search and Rescue Coordination Region III

World Biggest Tenders Source

This tender with title Approving the contractor selection plan for the Dredging and Maintenance of Wharf water area, Regional Center for Maritime Search and Rescue Coordination Region III -- Phê duyệt kế hoạch lựa chọn nhà thầu công trình Nạo vét duy tu khu nước Cầu cảng Trung tâm Phối hợp tìm kiếm, cứu nạn hàng hải khu vực III has been published on Bidding Source portal dated 08 Dec 2020 for the country of Vietnam. It has been categorized on Water-main refurbishment construction work & Wharf construction work & Dredging and pumping works. For similar tenders you can see tenders mentioned below of this page.

Phê duyệt kế hoạch lựa chọn nhà thầu công trình Nạo vét duy tu khu nước Cầu cảng Trung tâm Phối hợp tìm kiếm, cứu nạn hàng hải khu vực III

General Information

Approving the contractor selection plan for the Dredging and Maintenance of Wharf water area, Regional Center for Maritime Search and Rescue Coordination Region III
Phê duyệt kế hoạch lựa chọn nhà thầu công trình Nạo vét duy tu khu nước Cầu cảng Trung tâm Phối hợp tìm kiếm, cứu nạn hàng hải khu vực III
Invitation for Bids
20201227833 - 00
Vietnam
8 Dec 2020
15 Dec 2020
Vietnamese
Water-main refurbishment construction work , Wharf construction work , Dredging and pumping works

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Dredging of Settling Pond and Sludge Treatment at Tan Phu Water Plant - Dredging settling pond and sludge treatment at Tan Phu Water Plant - 7999546 Vietnam Construction and equipment installation supervision - Coal conveyor system of wharf cluster No. 1 - Lang Khanh port cluster - 89000167 Vietnam Construction - Dredging of Ho Cong Vien Lake (from the upper reaches of Sinh River to the end of Ho Cong Vien Lake) - 89000127 Vietnam Construction and repair of general wharf road No. 1 - Item: Repair of general wharf road No. 1, Project: Phase 1 of Go Dau B port - 89000194 Vietnam Construction and repair of bearing pads, piles, beam systems, and bridge decks - Items: Repair of bearing pads, piles and girder systems, bridge decks, Project: 10,000 DWT wharf (wharf A3) - Go Dau A Port, Project: Expansion of 10,000 DWT wharf (Wharf No. 3 expansion) - Go Dau A Port and Project: 2,000 DWT wharf (Wharf A1) - Go Dau A Port - 89000191 Vietnam Construction of dredging and maintenance of the water area in front of Lang Khanh port cluster - Dredging and maintaining the water area in front of Lang Khanh port cluster - 8099952 Vietnam Construction - Maintenance and repair on the 470T Floating Wharf No. 2 and Piling to reinforce the anchor and support pillars of the floating wharf, the 30-ton approach bridge system on both banks of Cat Lai ferry wharf - 89833501 Vietnam Consulting, surveying, designing, construction drawings and estimates - Reinforcing the dike surface from Ba Lai dam culvert to Thu ferry wharf and from Duong Khai culvert to the intersection with Ba Lai 8 bridge project (including bridges and culverts on the route) - 89833439 Vietnam Construction - Maintenance and repair on the BK-500A floating wharf and pile driving to reinforce the floating wharf positioning system, H30 approach bridge system on both banks of Binh Khanh ferry wharf - 89833500 Vietnam Construction works - Dredging Giang River - 8999424 Vietnam
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans