loader

World Tenders & Procurement Opportunities

RCC in implementation phase of Architectural renovation of 110kV Mong Duong, Giap Khau, Gieng Day, Cam Pha, Tien Yen, Mong Cai, Ha Tu, Quang Ha, Uong Bi 1 substations to meet remote control criteria.

World Biggest Tenders Source

This tender with title RCC in implementation phase of Architectural renovation of 110kV Mong Duong, Giap Khau, Gieng Day, Cam Pha, Tien Yen, Mong Cai, Ha Tu, Quang Ha, Uong Bi 1 substations to meet remote control criteria. -- KHLCNT giai đoạn thực hiện công trình Cải tạo kiến trúc các TBA 110kV Mông Dương, Giáp Khẩu, Giếng Đáy, Cẩm Phả, Tiên Yên, Móng Cái, Hà Tu, Quảng Hà, Uông Bí 1 đáp ứng tiêu chí điều khiển xa has been published on Bidding Source portal dated 01 Jan 2021 for the country of Vietnam. It has been categorized on Substation construction work & Remote-control equipment & Architectural and related services. For similar tenders you can see tenders mentioned below of this page.

KHLCNT giai đoạn thực hiện công trình Cải tạo kiến trúc các TBA 110kV Mông Dương, Giáp Khẩu, Giếng Đáy, Cẩm Phả, Tiên Yên, Móng Cái, Hà Tu, Quảng Hà, Uông Bí 1 đáp ứng tiêu chí điều khiển xa

General Information

RCC in implementation phase of Architectural renovation of 110kV Mong Duong, Giap Khau, Gieng Day, Cam Pha, Tien Yen, Mong Cai, Ha Tu, Quang Ha, Uong Bi 1 substations to meet remote control criteria.
KHLCNT giai đoạn thực hiện công trình Cải tạo kiến trúc các TBA 110kV Mông Dương, Giáp Khẩu, Giếng Đáy, Cẩm Phả, Tiên Yên, Móng Cái, Hà Tu, Quảng Hà, Uông Bí 1 đáp ứng tiêu chí điều khiển xa
Invitation for Bids
20201285953 - 00
Vietnam
1 Jan 2021
11 Jan 2021
Vietnamese
Substation construction work , Remote-control equipment , Architectural and related services

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Package No. 05/TVGS-2027: Supervision of construction and installation of power grid projects and capacitor bank installation in Dak Lak province in 2027 - 7816404 Vietnam Consulting, Surveying, Preparation of Feasibility Study Reports, and Preparation of Construction Drawings for the Project: Upgrading and Renovating the Medium-Voltage Power Grid in Phuoc Long Ward, 2027 - 7814463 Vietnam Package 03: Construction of the project to enhance the operational capacity of the medium and low voltage power grid, reduce power losses, and improve voltage quality on the power grid managed by Hoang Mai Power Company, Nghe An province in 2027. - 7816334 Vietnam Package No. 01/HH: Supply of materials and equipment and construction of the entire project: Completion of the power grid and prevention of overload in Kon Braih, Dak Rve, and Dak Koi communes, Quang Ngai province in 2027 - 7816351 Vietnam Package No. 03/TV: Supervision of construction and equipment installation for the project: Completion and overload prevention of the power grid in Son Tay, Son Tay Ha, Son Tay Thuong, Son Ha, Son Linh, and Son Ha communes. - 7816385 Vietnam Consulting, Surveying, Preparation of Feasibility Study Reports, and Preparation of Construction Drawings for the Project to Upgrade and Renovate the Medium-Voltage Power Grid in Long Binh and Tang Nhon Phu Wards in 2027 - 7814461 Vietnam Consulting, Surveying, Preparation of Feasibility Study Reports, and Preparation of Construction Drawings for the Project to Upgrade and Renovate the Medium-Voltage Power Grid in Long Truong and Long Phuoc Wards in 2027 - 7814462 Vietnam Construction, renovation, and upgrading of the THA power grid to improve operational capacity and reduce power losses in the communes of Thuong Bang La, Nghia Tam, Cat Thinh, Hung Khanh, Luong Thinh, and Viet Hong - Lao Cai province by 2027. - 7814447 Vietnam Package 03: Construction of the project to enhance the operational capacity of the low-voltage power grid, reduce power losses, and improve voltage quality on the power grid in Zone 1 managed by Do Luong Power Company, Nghe An province in 2027. - 7816333 Vietnam Package 03: Construction to enhance the operational capacity of the medium and low voltage power grid, reduce power losses, and improve voltage quality on the power grid in Zone 1 managed by Quynh Luu Power Company, Nghe An province in 2027 - 7816335 Vietnam
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans