Gói thầu số 02: Xúc dọn sạt lở, sửa đường QLVH, TC7 và xử lý xói lở mố cầu qua sông Đa Krông - Công trình nhà máy thủy điện Đa Krông 1.

World Biggest Tenders Source

This tender with title Gói thầu số 02: Xúc dọn sạt lở, sửa đường QLVH, TC7 và xử lý xói lở mố cầu qua sông Đa Krông - Công trình nhà máy thủy điện Đa Krông 1. -- Package 02: Excavation and landslide removal, repair of NHVH, TC7 and treatment of erosion of bridge abutment across Da Krong river - Da Krong 1 hydroelectric plant project. has been published on Bidding Source portal dated 31 May 2021 for the country of Vietnam. It has been categorized on Bridge construction work & Covered or partially-covered excavations & Hydro-electric plant construction work & Excavating and earthmoving work & Covered or partially-covered railway excavations & Covered or partially-covered road excavations. For similar tenders you can see tenders mentioned below of this page.

Package 02: Excavation and landslide removal, repair of NHVH, TC7 and treatment of erosion of bridge abutment across Da Krong river - Da Krong 1 hydroelectric plant project.

General Information

Gói thầu số 02: Xúc dọn sạt lở, sửa đường QLVH, TC7 và xử lý xói lở mố cầu qua sông Đa Krông - Công trình nhà máy thủy điện Đa Krông 1.
Package 02: Excavation and landslide removal, repair of NHVH, TC7 and treatment of erosion of bridge abutment across Da Krong river - Da Krong 1 hydroelectric plant project.
Invitation for Bids
20210569229 - 00
Vietnam
31 May 2021
18 Jun 2021
Vietnamese
Bridge construction work , Covered or partially-covered excavations , Hydro-electric plant construction work , Excavating and earthmoving work , Covered or partially-covered railway excavations , Covered or partially-covered road excavations

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Maintenance and repair of the section from Ke Bridge to Long Thanh Bridge (Including costs of ensuring traffic safety during construction) - March 8th Street; Item: Maintenance and repair of the section from Ke Bridge to Long Than - 7999430 Vietnam Provincial Road 819 - Construction and renovation of Provincial Road 819 from Cai Bat Bridge to Kenh T7 Bridge and the section connecting to the stele house of Nguyen Van Troi relic site - 2000761 Vietnam Construction and repair of bearing pads, piles, beam systems, and bridge decks - Items: Repair of bearing pads, piles and girder systems, bridge decks, Project: 10,000 DWT wharf (wharf A3) - Go Dau A Port, Project: Expansion of 10,000 DWT wharf (Wharf No. 3 expansion) - Go Dau A Port and Project: 2,000 DWT wharf (Wharf A1) - Go Dau A Port - 89000191 Vietnam Construction of the section from Km0+00 - Km0+248.46 (road section) - Road connecting from Thach Han bridge to the center of An Don ward, Quang Tri town - 89000216 Vietnam Maintenance of concrete road section from Giong Ke bridge to bridge No. 3 (remaining damaged locations) - Maintenance of concrete road from Giong Ke bridge to bridge number 3 (remaining damaged locations) - 89000364 Vietnam Construction - Project to repair and upgrade the inter-village road from Quyen village's Suspension Bridge to the cultural house of Hat village (old) - 89000131 Vietnam Construction and installation works - Repairing Linh Cam Bridge Km19+219; Repairing damaged roadbed, road surface, longitudinal drainage ditches and traffic safety system section Km65+700÷Km67+200; Handling landslides on negative slope Km62+050; Strengthening traffic safety system through school locations Km40+200, Km48+180, Km48+530, Km48+780, Km48+810, National Highway 8, Ha Tinh province - 8099940 Vietnam Construction of the Bridge connecting the 8th and 9th floors of Areas D and E of Tra Vinh Provincial General Hospital - BRIDGE CONNECTING THE 8TH AND 9TH FLOORS OF AREA D AND AREA E OF TRA VINH PROVINCIAL GENERAL HOSPITAL - 8099964 Vietnam Construction of tunnel excavation for production lines in 2025 outsourced at Vi Kem copper mine - The 2025 production preparation tunnels are outsourced at the Vi Kem copper mine. - 8099972 Vietnam Construction (Bao An village 2 bridge + Vai Sieu village 6 bridge) - Overflow bridge of village 2 Bao An, Kim Son commune; Bridge of village 6 Vai Sieu, Thuong Ha commune; Overflow bridge of village Bun 3; Overflow bridge of village Luc, Bao Ha commune, Bao Yen district - 8099921 Vietnam
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans