loader

World Tenders & Procurement Opportunities

Về việc phê duyệt kế hoạch lựa chọn nhà thầu Dự án: Mua sắm vật tư, thiết bị, thuê dịch vụ phi tư vấn phục vụ vận hành Nhà máy xử lý nước thải

World Biggest Tenders Source

This tender with title Về việc phê duyệt kế hoạch lựa chọn nhà thầu Dự án: Mua sắm vật tư, thiết bị, thuê dịch vụ phi tư vấn phục vụ vận hành Nhà máy xử lý nước thải -- About the approval of the contractor selection plan Project: Procurement of materials and equipment, hire non-consulting services to serve the operation of the wastewater treatment plant has been published on Bidding Source portal dated 22 Jun 2021 for the country of Vietnam. It has been categorized on Refuse disposal and treatment & Water-treatment work & Water-treatment plant construction work & Drinking-water treatment plant construction work & Waste-treatment plant construction work & Construction work for water projects & Consulting services for water-supply and waste consultancy. For similar tenders you can see tenders mentioned below of this page.

About the approval of the contractor selection plan Project: Procurement of materials and equipment, hire non-consulting services to serve the operation of the wastewater treatment plant

General Information

Về việc phê duyệt kế hoạch lựa chọn nhà thầu Dự án: Mua sắm vật tư, thiết bị, thuê dịch vụ phi tư vấn phục vụ vận hành Nhà máy xử lý nước thải
About the approval of the contractor selection plan Project: Procurement of materials and equipment, hire non-consulting services to serve the operation of the wastewater treatment plant
Invitation for Bids
20210664320 - 00
Vietnam
22 Jun 2021
28 Jun 2021
Vietnamese
Refuse disposal and treatment , Water-treatment work , Water-treatment plant construction work , Drinking-water treatment plant construction work , Waste-treatment plant construction work , Construction work for water projects , Consulting services for water-supply and waste consultancy

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Construction supervision and equipment installation consulting services (phase 1) - Nhon Hau - Nhon My Domestic Water Supply Plant - 7999556 Vietnam regular solid waste, hazardous medical waste at Children's Hospital 2 in 2025-2026 - Providing collection, transportation and treatment services: regular solid waste, hazardous medical waste at Children's Hospital 2 in 2025-2026 - 7999443 Vietnam Centralized wastewater treatment in Mui Ne National Tourist Area, Phan Thiet city - Construction and installation of equipment for the entire project - 2000814 Vietnam Consulting fee - Medical waste collection service at Trung My Tay General Hospital - 2000928 Vietnam TV5: Consulting on preparing a Feasibility Study Report according to Vietnamese regulations, conducting additional surveys for the Feasibility Study Report preparation step, and establishing a Building Information Model (BIM) for the Feasibility Study Report preparation step. - Improving drainage and wastewater systems and adapting to climate change in the Tham Luong – Ben Cat basin - 89000708 Vietnam Construction and installation - Renovating the wastewater treatment system of Post Office Hospital, Branch 2 - 89000176 Vietnam (DVN-VT-3495/25-XL-DA-TTH-MAITTT.TM ) Materias for Potable/ Service Water Storage Tank Portable Open Drain Tote Tank - Project: EPCIC Thien Nga - Hai Au Field Development Project Phase 1 Block 12/11, offshore Vietnam (Contact: Ms. Tran Thi Tuyet Mai - EPCIC THIEN NGA - HAI AU FIELD DEVELOPMENT PROJECT PHASE 1 BLOCK 12/11, OFFSHORE VIETNAM - 89000045 Vietnam Providing collection, transportation and treatment services for medical waste and domestic waste at 3 facilities of Vinh City General Hospital in 2025-2026 - 89000429 Vietnam Turbine system of unit H1, Speed ​​control system of unit H1, Technical water system of unit H1, Generator system of unit H1, Excitation system of unit H1, Transformer T1, Terminal electrical system of unit H1, 0.4 kV electrical system of unit 1, Transformer TD91, DC power system of unit 1 and UPS system of unit 1, Lighting system in the factory, Spillway equipment system and Water intake system - Project: Major repair of fixed assets in 2026 of Dong Nai 5 Hydropower Company - TKV - 89000706 Vietnam Turnkey Project for investment in construction of wastewater treatment system for rubber processing factory with capacity of 650 m3/day and night - Investment project to build a wastewater treatment system for a rubber processing factory with a capacity of 650 m3/day and night - 89000707 Vietnam
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans