loader

World Tenders & Procurement Opportunities

Thực hiện nhiệm vụ đánh giá môi trường cấp Bộ Quốc phòng

World Biggest Tenders Source

This tender with title Thực hiện nhiệm vụ đánh giá môi trường cấp Bộ Quốc phòng -- Carrying out the task of environmental assessment at the Ministry of National Defense level has been published on Bidding Source portal dated 15 Jul 2021 for the country of Vietnam. It has been categorized on Environmental services & Environmental impact assessment for construction. For similar tenders you can see tenders mentioned below of this page.

Carrying out the task of environmental assessment at the Ministry of National Defense level

General Information

Thực hiện nhiệm vụ đánh giá môi trường cấp Bộ Quốc phòng
Carrying out the task of environmental assessment at the Ministry of National Defense level
Invitation for Bids
20210735675 - 00
Vietnam
15 Jul 2021
23 Jul 2021
Vietnamese
Environmental services , Environmental impact assessment for construction

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Training conference to improve community monitoring capacity, change people's thinking and awareness about environmental impacts and food safety - 883897 Vietnam Package "Soil sample analysis" under the task "Investigation and assessment of the current status of soil environment in the Central Highlands to serve sustainable land management and use" - 08569 Vietnam Develope a gender-inclusive Environmental and Social Impact Assessment - 09161 Vietnam Consulting, Surveying, and Preparing Environmental Impact Assessment Reports - 04227 Vietnam A National consultancy firm to study on plastic material flows in Viet Nam. - Vietnam Vietnam Conduct Environmental Social-Economic Impact Assessment (ESIA) for the Bor Flood Risk Management Project. Vietnam Cua Lo Beach Access and Environmental Improvements, Nghe An -- <br><b>(i) Construction of a dike route (sea embankment) with a total construction investment length of 4,308km (reinforced concrete embankment roof structure). - Starting point: Km0+00 at the entrance to Lan Chau Island in Thu Thuy ward, Cua Lo town. - End point: Km5+451.99 (continued) adjacent to the fence of Vinpearl Resort - Cua Hoi) in Nghi Hoa ward, Cua Lo town; <br>(ii) Construction of a promenade along the coast with surface textures concrete road along the embankment route is 3,251m long, combined with lighting system and trees along the route; <br>(iii) Construction of some crossroads and drainage and lighting systems, including 29 crossroads with a total length of 2,993m to connect Binh Minh road with the promenade along the coastline.</b> Vietnam Contract Awarded - Vietnam - Consultant to develop environmental impact assessment report (EIA), environmental and social impact assessment report (ESIA), social assessment report (SA), resettlement action plan (RAP) - Sub-Project 2 - Dam rehabilitation and Safety Improvement projec Vietnam Tien Pagoda Access and Environmental Improvements in Lac Thuy district, Hoa Binh province Vietnam Kế hoạch lựa chọn nhà thầu thực hiện Nhiệm vụ Đánh giá nguy cơ gây ô nhiễm môi trường và xây dựng Đề án quốc gia thiết lập hệ thống thu hồi, xử lý và tái chế tấm pin điện mặt trời thải bỏ -- <br><b>The plan to select contractors to carry out the Task of assessing the risk of environmental pollution and developing a national project to establish a system to recover, treat and recycle discarded solar panels</b> Vietnam
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans