loader

World Tenders & Procurement Opportunities

Mua sắm trang thiết bị quan trắc, phân tích môi trường

World Biggest Tenders Source

This tender with title Mua sắm trang thiết bị quan trắc, phân tích môi trường -- Procurement of equipment for environmental monitoring and analysis has been published on Bidding Source portal dated 27 Jul 2021 for the country of Vietnam. It has been categorized on Environmental services & Environmental monitoring for construction & Detection and analysis apparatus & Environmental indicators analysis other than for construction & Analysis apparatus. For similar tenders you can see tenders mentioned below of this page.

Procurement of equipment for environmental monitoring and analysis

General Information

Mua sắm trang thiết bị quan trắc, phân tích môi trường
Procurement of equipment for environmental monitoring and analysis
Invitation for Bids
20210777762 - 00
Vietnam
27 Jul 2021
4 Aug 2021
Vietnamese
Environmental services , Environmental monitoring for construction , Detection and analysis apparatus , Environmental indicators analysis other than for construction , Analysis apparatus

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Purchase of equipment for environmental monitoring - 91311 Vietnam Environmental monitoring according to the Environmental Protection Project and Labor Environment Monitoring in 2025 - 08572 Vietnam Consulting, supervising and reviewing technical design, TKBVTC of Phase 1 - Investment Project, installing online coal mass measurement system at conveyor lines BC1A/B, wharfs 1 and 2 and online coal analysis system at wharfs 1 and 2 of Duyen Hai Power Center - 05021 Vietnam Package No. 21: Environmental monitoring consultancy during construction - 08284 Vietnam Prepare environmental monitoring and supervision report for Tu Liem Industrial Park - 04079 Vietnam A National consultancy firm to study on plastic material flows in Viet Nam. - Vietnam Vietnam Cua Lo Beach Access and Environmental Improvements, Nghe An -- <br><b>(i) Construction of a dike route (sea embankment) with a total construction investment length of 4,308km (reinforced concrete embankment roof structure). - Starting point: Km0+00 at the entrance to Lan Chau Island in Thu Thuy ward, Cua Lo town. - End point: Km5+451.99 (continued) adjacent to the fence of Vinpearl Resort - Cua Hoi) in Nghi Hoa ward, Cua Lo town; <br>(ii) Construction of a promenade along the coast with surface textures concrete road along the embankment route is 3,251m long, combined with lighting system and trees along the route; <br>(iii) Construction of some crossroads and drainage and lighting systems, including 29 crossroads with a total length of 2,993m to connect Binh Minh road with the promenade along the coastline.</b> Vietnam Tien Pagoda Access and Environmental Improvements in Lac Thuy district, Hoa Binh province Vietnam Thực hiện phân tích thử nghiệm các đồng phân của Dioxin/Furan trong các thành phần môi trường do Trung tâm kỹ thuật Tài nguyên và Môi trường Đồng Nai làm chủ đầu tư -- <br><b>Carrying out experimental analysis of isomers of Dioxin/Furan in environmental components invested by Dong Nai Technical Center for Natural Resources and Environment.</b> Vietnam Kế hoạch lựa chọn nhà thầu gói thầu thuộc nhiệm vụ lập báo cáo đánh giá tác động môi trường và giám sát môi trường dự án TS05 -- <br><b>The plan for selecting contractors for the bidding package under the task of making environmental impact assessment reports and environmental monitoring of the TS05 project</b> Vietnam
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans