loader

World Tenders & Procurement Opportunities

Thay thế tuyến cáp ngầm trung thế 22kV lộ 467 E1.8 và lộ 482 E1.21 vận hành không đảm bảo an toàn

World Biggest Tenders Source

This tender with title Thay thế tuyến cáp ngầm trung thế 22kV lộ 467 E1.8 và lộ 482 E1.21 vận hành không đảm bảo an toàn -- Replace the 22kV underground medium voltage cable line 467 E1.8 and 482 E1.21 with unsafe operation has been published on Bidding Source portal dated 30 Aug 2021 for the country of Vietnam. It has been categorized on Underground work other than tunnels, shafts and subways & Cable & Cable, wire and related products & Medium-voltage cable & Medium-voltage installation work. For similar tenders you can see tenders mentioned below of this page.

Replace the 22kV underground medium voltage cable line 467 E1.8 and 482 E1.21 with unsafe operation

General Information

Thay thế tuyến cáp ngầm trung thế 22kV lộ 467 E1.8 và lộ 482 E1.21 vận hành không đảm bảo an toàn
Replace the 22kV underground medium voltage cable line 467 E1.8 and 482 E1.21 with unsafe operation
Invitation for Bids
20210860028 - 00
Vietnam
30 Aug 2021
6 Sep 2021
Vietnamese
Underground work other than tunnels, shafts and subways , Cable , Cable, wire and related products , Medium-voltage cable , Medium-voltage installation work

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Purchasing materials for manufacturing Reflective Wire Boxes in 2025 - 884097 Vietnam Replacing long-term 22kV medium voltage underground cables, improving power supply capacity of route 471 E1.21, 478 E1.21 in Tay Ho district - 883954 Vietnam Additional cable purchases in 2025 - 884521 Vietnam Purchasing materials for production of Reflective Wire Boxes in 2025 - 884093 Vietnam Purchase of right-twisted 26mm steel cable for NL factory - 884131 Vietnam 1. Construct 02 new 22kV output lines from E1.41 Mai Lam substation to supply power to Vinhomes Coloa Urban Area; 2. Construct underground cable lines of loop 3 to supply power to Vinhomes Coloa Urban Area; 3. Construct underground cable lines of loop 1 and loop 2 to supply power to Vinhomes Coloa Urban Area; 4. Construct substations of loop 1 to supply power to Vinhomes CoLoa Urban Area; 5. Construct substations of loop 2 to supply power to Vinhomes CoLoa Urban Area; 6. Construct substations of loop 3 to supply power to Vinhomes CoLoa Urban Area. - 884530 Vietnam (1) Renovating transformer stations in Hai Ba Trung district in 2025 (O Dong Mac, Thanh Luong, Bach Dang, Bach Khoa wards); (2) Installing capacitor bank control cabinets at transformer stations on the Hai Ba Trung district power grid, phase 2, 2025; (3) Installing additional medium-voltage switching equipment with remote monitoring and control functions on the Hai Ba Trung district medium-voltage power grid in 2025 - phase 2. - 884537 Vietnam Developing underground medium and low voltage power grid from Hong Ky culvert to Tan Ky Tan Quy bridge in sync with the project of Infrastructure construction and environmental improvement of Tham Luong - Ben Cat - Rach Nuoc Len canal - 91197 Vietnam Developing underground medium and low voltage power grid from Tan Ky Tan Quy Bridge to Bung Bridge in sync with the project of Infrastructure construction and environmental improvement of Tham Luong - Ben Cat - Rach Nuoc Len canal - 91198 Vietnam Construction of new underground spillway bridge on Road 4B (17-span bridge) in Hai Yen Ward, Mong Cai City - 08304 Vietnam
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans