loader

World Tenders & Procurement Opportunities

XDM NRTA đấu nối trụ 57/8, 73B/9, 108B, 128, 137/54, 147, 159B/6B, 171B/2/6B, 207C/48/12 tuyến 474TBI, 176/58/2/26/13 tuyến 476TH, 51/33/10 tuyến 478TH, 162/4P, 140/40/1/1 tuyến 471TBI, 47B, 99 tuyến 478TBI, 17/23B/13, 17/96A, 17/161 tuyến 476TBI; XDM các TBA, NRHA và nâng cấp lưới điện hạ áp lên 1 pha 3 dây, 3 pha khu vực huyện Tân Biên để chống quá tải và giảm tổn thất năm 2022

World Biggest Tenders Source

This tender with title XDM NRTA đấu nối trụ 57/8, 73B/9, 108B, 128, 137/54, 147, 159B/6B, 171B/2/6B, 207C/48/12 tuyến 474TBI, 176/58/2/26/13 tuyến 476TH, 51/33/10 tuyến 478TH, 162/4P, 140/40/1/1 tuyến 471TBI, 47B, 99 tuyến 478TBI, 17/23B/13, 17/96A, 17/161 tuyến 476TBI; XDM các TBA, NRHA và nâng cấp lưới điện hạ áp lên 1 pha 3 dây, 3 pha khu vực huyện Tân Biên để chống quá tải và giảm tổn thất năm 2022 -- XDM NRTA connects posts 57/8, 73B/9, 108B, 128, 137/54, 147, 159B/6B, 171B/2/6B, 207C/48/12 lines 474TBI, 176/58/2/26/13 line 476TH, 51/33/10 line 478TH, 162/4P, 140/40/1/1 line 471TBI, 47B, 99 line 478TBI, 17/23B/13, 17/96A, 17/161 line 476TBI; XDM substations, NRHA and upgrade low-voltage power grid to 1-phase, 3-wire, 3-phase in Tan Bien district to prevent overload and reduce losses in 2022 has been published on Bidding Source portal dated 11 Oct 2021 for the country of Vietnam. It has been categorized on Substation construction work & Low-voltage installation work. For similar tenders you can see tenders mentioned below of this page.

XDM NRTA connects posts 57/8, 73B/9, 108B, 128, 137/54, 147, 159B/6B, 171B/2/6B, 207C/48/12 lines 474TBI, 176/58/2/26/13 line 476TH, 51/33/10 line 478TH, 162/4P, 140/40/1/1 line 471TBI, 47B, 99 line 478TBI, 17/23B/13, 17/96A, 17/161 line 476TBI; XDM substations, NRHA and upgrade low-voltage power grid to 1-phase, 3-wire, 3-phase in Tan Bien district to prevent overload and reduce losses in 2022

General Information

XDM NRTA đấu nối trụ 57/8, 73B/9, 108B, 128, 137/54, 147, 159B/6B, 171B/2/6B, 207C/48/12 tuyến 474TBI, 176/58/2/26/13 tuyến 476TH, 51/33/10 tuyến 478TH, 162/4P, 140/40/1/1 tuyến 471TBI, 47B, 99 tuyến 478TBI, 17/23B/13, 17/96A, 17/161 tuyến 476TBI; XDM các TBA, NRHA và nâng cấp lưới điện hạ áp lên 1 pha 3 dây, 3 pha khu vực huyện Tân Biên để chống quá tải và giảm tổn thất năm 2022
XDM NRTA connects posts 57/8, 73B/9, 108B, 128, 137/54, 147, 159B/6B, 171B/2/6B, 207C/48/12 lines 474TBI, 176/58/2/26/13 line 476TH, 51/33/10 line 478TH, 162/4P, 140/40/1/1 line 471TBI, 47B, 99 line 478TBI, 17/23B/13, 17/96A, 17/161 line 476TBI; XDM substations, NRHA and upgrade low-voltage power grid to 1-phase, 3-wire, 3-phase in Tan Bien district to prevent overload and reduce losses in 2022
Invitation for Bids
20211019995 - 00
Vietnam
11 Oct 2021
28 Oct 2021
Vietnamese
Substation construction work , Low-voltage installation work

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

2026-XL-29: Supply of materials and equipment, construction and installation, and insurance for the major repair of fixed assets at transformer substations - 7893308 Vietnam 2026-XL-33: Supply of materials and equipment, construction and installation, and insurance for major repair of fixed assets on main medium voltage grid line; MCT: CCHD2705009 - 7893310 Vietnam 2026-XL-30: Supply of materials and equipment, construction and installation, and insurance for the major repair of fixed assets at transformer substations - 7893309 Vietnam Investment in renovation and upgrading of the monitoring, control, and protection system for generating units; and the electricity metering system - 8925994 Vietnam Package 59.XL.SCL2026: Repair of outdoor cable trench at Hue 220kV Substation - 8461541 Vietnam Package No. 16: Construction of substation (including fire protection, communication and SCADA systems, safety equipment, and office administration) - 8461632 Vietnam Constructing 01 22kV output line from Dai Kim 110kV substation to connect with Linh Dam 110kV substation - 9000248 Vietnam Constructing 01 22kV output line from Dai Kim 110kV substation to connect with Linh Dam 110kV substation - 9000247 Vietnam Construction - Construction of new substations in Thanh Tri district in 2025 (Tan Trieu and Van Phuc communes) - 7999595 Vietnam Repair - SCL list: 35kV branch line and Ban Bo 2 substation, 35kV branch line and Na Hieng substation, 35kV branch line Na Khuy, 35kV branch line Nam Khan, 35kV branch line Uy Dao operated by Tan Uyen Regional Power Management Team - 7999438 Vietnam
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans