loader

World Tenders & Procurement Opportunities

Przeprowadzenie badań stanu środowiska gruntowo – wodnego przed rozpoczęciem prac i po zakończeniu prac dla prac poszukiwawczych realizowanych przez PGNiG SA – umowa ramowa.

World Biggest Tenders Source

This tender with title Przeprowadzenie badań stanu środowiska gruntowo – wodnego przed rozpoczęciem prac i po zakończeniu prac dla prac poszukiwawczych realizowanych przez PGNiG SA – umowa ramowa. -- Environmental impact assessment other than for construction has been published on Bidding Source portal dated 17 Jan 2022 for the country of Poland. It has been categorized on Environmental impact assessment other than for construction. For similar tenders you can see tenders mentioned below of this page.

Environmental impact assessment other than for construction

General Information

Przeprowadzenie badań stanu środowiska gruntowo – wodnego przed rozpoczęciem prac i po zakończeniu prac dla prac poszukiwawczych realizowanych przez PGNiG SA – umowa ramowa.
Environmental impact assessment other than for construction
Invitation for Bids
2022/S 010-022214
Poland
Poland-Warsaw
17 Jan 2022
16 Feb 2022
English
Environmental impact assessment other than for construction

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Market research services – Preparation of the study "Forecast of the environmental impact of the draft Development Strategy of the Lower Silesian Voivodeship 2030+" - 191552-2024 Poland Poland – Feasibility study, advisory service, analysis – Preparation of a Feasibility Study (together with CBA) together with a Report on the environmental impact of the project, a Report on the disposal of spoil into the sea and auxiliary studies for the Investment entitled "Conducting works to enable water transport to the Outer Port in Świnoujście." - 86585-2024 Poland Feasibility study, advisory service, analysis - Preparation of a Feasibility Study (together with CBA) together with a Report on the environmental impact of the project, a Report on the disposal of spoil into the sea and auxiliary studies for the Investment entitled "Conducting works to enable water transport to the Outer Port in Świnoujście." - 86585-2024 Poland Preparation of a draft forest management plan for the period 2026 - 2035 for the Mińsk, Siedlce, Sokołów Forest Districts, along with a forecast of the plan's impact on the environment Poland Preparation of a Feasibility Study (together with CBA) together with a Report on the impact of the project on the environment, a Report on the disposal of spoil into the sea and auxiliary studies for the Investment entitled Carrying out works to enable water transport to the Outer Port in Świnoujście. Poland Environmental impact assessment other than for construction - Monitoring osadów dennych rzek i jezior w latach 2020–2021 Poland Poland-Wrocław: Forestry management services Poland Environmental impact assessment other than for construction – Program for sampling and measuring radioactivity in the atmosphere, soil, water and the food chain on behalf of the Federal Nuclear Control Agency 2025-2028 - 264752-2024 Belgium Private initiative PPP relating to energy and maintenance management services with EPC contract including the management and operation of the plants and energy efficiency interventions and actions to reduce the environmental impact of ASUGI Isontina. - 260537-2024 Italy 2040 Daegu Metropolitan City Park and Greenway Basic Plan Strategic Environmental Impact Assessment Service - 20240446259 - 00 Korea, South
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans