kế hoạch lựa chọn nhà thầu công trình “Đường dây trung thế 22kV cấp điện cho Cụm công nghiệp Phú Cường”

World Biggest Tenders Source

This tender with title kế hoạch lựa chọn nhà thầu công trình “Đường dây trung thế 22kV cấp điện cho Cụm công nghiệp Phú Cường” -- Plan to select contractor for the project "22kV medium voltage transmission line to supply power to Phu Cuong industrial cluster" has been published on Bidding Source portal dated 16 Feb 2022 for the country of Vietnam. It has been categorized on Medium-voltage installation work & Medium-voltage equipment. For similar tenders you can see tenders mentioned below of this page.

Plan to select contractor for the project "22kV medium voltage transmission line to supply power to Phu Cuong industrial cluster"

General Information

kế hoạch lựa chọn nhà thầu công trình “Đường dây trung thế 22kV cấp điện cho Cụm công nghiệp Phú Cường”
Plan to select contractor for the project "22kV medium voltage transmission line to supply power to Phu Cuong industrial cluster"
Invitation for Bids
20220209915 - 00
Vietnam
16 Feb 2022
7 Mar 2022
Vietnamese
Medium-voltage installation work , Medium-voltage equipment

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Construction of projects to install controlled switching equipment on the medium voltage grid of Bac Tu Liem district in 2025 - Installing capacitor bank switching equipment with SCADA function on the medium voltage line of Bac Tu - 7999388 Vietnam Package 04 – 26 “Medium voltage equipment and accessories of all kinds” - Package 04 – 26 “Medium voltage equipment and accessories of all kinds” - 2000824 Vietnam Construction and insurance purchase of the project "Overhaul to restore normal operation of medium voltage switchgear of Go Vap Power Company in 2026 - Item of replacing RMU cabinet cover does not ensure operational safety - Overhaul to restore normal operation of medium voltage switchgear of Go Vap Power Company in 2026 - Item of replacing RMU cabinet cover does not ensure operational safety - 89000188 Vietnam Survey consultancy 02- DTXD 2026 - 1. Improving the power supply capacity of the low-voltage grid in Long Bien district in 2026 (wards of Ngoc Lam, Ngoc Thuy, Phuc Loi, Sai Dong, Long Bien); 2. Improving the power supply capacity of medium-voltage lines in Long Bien district in 2026.... - 89000690 Vietnam Equipment supply and construction - Improving the reliability of power supply of the medium voltage grid in Duc Tho district - Ha Tinh province by 2025 using the multi-split - multi-connect (MDMC) method - 89000302 Vietnam Supply of medium and low voltage power cables - Construction and infrastructure projects in 2025, Phase 4 - 89000685 Vietnam TVTT 25-01: Consulting on reviewing BCNCKT; reviewing TKBVTC-DT for construction of works for the project "Completing the medium voltage grid to ensure electricity supply in Tan Thoi Nhi and Xuan Thoi Son communes - Hoc Mon district" - Completing the medium voltage grid to ensure electricity supply in Tan Thoi Nhi and Xuan Thoi Son communes - Hoc Mon district - 89000709 Vietnam Supplying materials, equipment and construction and installation of 0.4kV DZ Defect Handling projects after Muong La Substation, Chieng An Market, Candy Factory 2, An Sinh, Son La City Television Station in 2026 - Medium and low voltage power grid SCL items in Son La province in 2026 - 89000689 Vietnam Construction of the Project to Improve the capacity of operating the medium and low voltage grid, reduce power outages on the grid managed by the Thanh Chuong Power Grid Management Team in 2025 - Improving the capacity of operating the medium and low voltage grid, reducing power outages on the grid managed by Thanh Chuong Power Supply Management Team in 2025 - 8099967 Vietnam Construction of the project to improve the operating capacity of the medium and low voltage grid, reduce power outages and reduce the number of low voltage customers on the grid managed by the Quynh Luu LKV Power Supply Management Team in 2025 - 8099970 Vietnam
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans