loader

World Tenders & Procurement Opportunities

Repairing the embankment of the cooling water channel for Ca Mau 1 and 2 . Power Plants

World Biggest Tenders Source

This tender with title Repairing the embankment of the cooling water channel for Ca Mau 1 and 2 . Power Plants has been published on Bidding Source portal dated 13 Jul 2022 for the country of Vietnam. It has been categorized on Construction works for power plants and heating plants & Construction work for power plant & Embankment works & Stator cooling water systems. For similar tenders you can see tenders mentioned below of this page.

General Information

Repairing the embankment of the cooling water channel for Ca Mau 1 and 2 . Power Plants
Invitation for Bids
20220728928 - 00
Vietnam
13 Jul 2022
27 Jul 2022
Vietnamese
Construction works for power plants and heating plants , Construction work for power plant , Embankment works , Stator cooling water systems

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Awarded - Vietnam - Upgrading the road on embankment along Thai river in two communes Quang Kim and Quang Phu on Quang Trach district. Vietnam Awarded - Vietnam - Construction embankment paragraph Tieu Dua - Kim Qui An Minh district Vietnam Contract Awarded - Construction works of the package Upgrade and repair embankments to prevent erosion of the Hau river bank, Tien Thuy commune, Quynh Luu District. Vietnam Cua Lo Beach Access and Environmental Improvements, Nghe An -- <br><b>(i) Construction of a dike route (sea embankment) with a total construction investment length of 4,308km (reinforced concrete embankment roof structure). - Starting point: Km0+00 at the entrance to Lan Chau Island in Thu Thuy ward, Cua Lo town. - End point: Km5+451.99 (continued) adjacent to the fence of Vinpearl Resort - Cua Hoi) in Nghi Hoa ward, Cua Lo town; <br>(ii) Construction of a promenade along the coast with surface textures concrete road along the embankment route is 3,251m long, combined with lighting system and trees along the route; <br>(iii) Construction of some crossroads and drainage and lighting systems, including 29 crossroads with a total length of 2,993m to connect Binh Minh road with the promenade along the coastline.</b> Vietnam Contract Awarded - Upgrading the Gianh riverside embankment from Tan Truong village to Quang Tan market, Tan Hoa village of Quang Tan commune on Ba Don town. Vietnam Kế hoạch LCNT Gói thầu SCL01-2023: Tư vấn khảo sát, lập báo cáo đánh giá an toàn mái đào khu vực đường ống áp lực, thiết kế sửa chữa gia cố cải tạo cơ 325m cơ 315m và khu vực đường VH3 TC9 Nhà máy Thủy điện Sông Bung 2 Danh mục SCL năm 2023: Thi công Gia cố mái đào đường ống áp lực, cơ 315 cơ 325m và khu vực đường VH3 TC9 – NMTĐ Sông Bung 2 -- <br><b>LCNT plan SCL01-2023 package: Consulting survey, making report on safety assessment of excavated roof of pressure pipeline area, design, repair, reinforcement, and renovation of 325m engine 315m and VH3 TC9 road area Factory Song Bung 2 Hydropower Plant SCL List in 2023: Construction and reinforcement of roof, digging pressure pipeline, 315 engine 325m and road area VH3 TC9 – Song Bung 2 Hydropower Plant</b> Vietnam KHLCNT SCL 2023 Tư vấn khảo sát, lập Báo cáo kinh tế - kỹ thuật Đường dây 220kV Pleiku – NMĐ SK An Khê -- <br><b>SCL 2023 Civil Engineering and Construction Consulting, surveying, preparing economic - technical reports 220kV Pleiku - SK An Khe Power Plant</b> Vietnam Kế hoạch lựa chọn nhà thầu một số gói thầu tư vấn dự án Cải tạo, nâng cấp đê hữu Cầu đoạn từ Km17+00 đến Km28+828 và kè bờ sông hữu Cầu đoạn từ Km25+350 đến Km26+00 xã Bắc Phú, huyện Sóc Sơn, thành phố Hà Nội -- <br><b>The plan to select contractors for a number of consultancy bidding packages for the project of Renovating and upgrading the right dyke Bridge from Km17+00 to Km28+828 and embankment of the right Cau river from Km25+350 to Km26+00 in Bac Phu commune, Soc Son district, Hanoi city</b> Vietnam Danh mục: Công trình Nhà máy thủy điện Sơn La. Hạng mục: Gian máy. Mục: Xử lý thấm thép ốp khuỷu côn hút tổ máy H1 -- <br><b>Category: Son La Hydropower Plant Project. Category: Machine booth. Item: Treatment of permeation of steel for the intake cone of unit H1</b> Vietnam E-SCTX18 - 2022: Thay thế, duy tu, bảo dưỡng các mốc bị mất, sơn lại toàn bộ mốc hành lang bảo vệ hồ chứa – Nhà máy thủy điện Sơn La, Lai Châu (Lần 2). -- <br><b>E-SCTX18 - 2022: Replace, maintain and maintain lost landmarks, repaint all landmarks of reservoir protection corridor – Son La Hydropower Plant, Lai Chau (2nd time).</b> Vietnam
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans