Plan to select consultant contractor Works: Building a 22kV loop circuit between Linh Cam 110kV substation (E18.2) and Huong Son 110kV substation (E18.7), improving the reliability of power supply in Huong district area Son, Duc Tho district; Improve the reliability of power supply of medium-voltage power grids in Ha Tinh city and Loc Ha district, Ha Tinh province according to the multi-split-multiple connection (MDMC) scheme.

World Biggest Tenders Source

This tender with title Plan to select consultant contractor Works: Building a 22kV loop circuit between Linh Cam 110kV substation (E18.2) and Huong Son 110kV substation (E18.7), improving the reliability of power supply in Huong district area Son, Duc Tho district; Improve the reliability of power supply of medium-voltage power grids in Ha Tinh city and Loc Ha district, Ha Tinh province according to the multi-split-multiple connection (MDMC) scheme. --
Kế hoạch lựa chọn nhà thầu tư vấn Các công trình: Xây dựng mạch vòng 22kV giữa TBA 110kV Linh Cảm (E18.2) và TBA 110kV Hương Sơn (E18.7), nâng cao độ tin cậy cung cấp điện khu vực huyện Hương Sơn, huyện Đức Thọ; Nâng cao độ tin cậy cung cấp điện của lưới điện trung áp khu vực thành phố Hà Tĩnh và huyện Lộc Hà, tỉnh Hà Tĩnh theo phương án đa chia - đa nối (MDMC).
has been published on Bidding Source portal dated 25 Jul 2022 for the country of Vietnam. It has been categorized on Substation equipment & Power supply accessories & Medium-voltage equipment. For similar tenders you can see tenders mentioned below of this page.


Kế hoạch lựa chọn nhà thầu tư vấn Các công trình: Xây dựng mạch vòng 22kV giữa TBA 110kV Linh Cảm (E18.2) và TBA 110kV Hương Sơn (E18.7), nâng cao độ tin cậy cung cấp điện khu vực huyện Hương Sơn, huyện Đức Thọ; Nâng cao độ tin cậy cung cấp điện của lưới điện trung áp khu vực thành phố Hà Tĩnh và huyện Lộc Hà, tỉnh Hà Tĩnh theo phương án đa chia - đa nối (MDMC).

General Information

Plan to select consultant contractor Works: Building a 22kV loop circuit between Linh Cam 110kV substation (E18.2) and Huong Son 110kV substation (E18.7), improving the reliability of power supply in Huong district area Son, Duc Tho district; Improve the reliability of power supply of medium-voltage power grids in Ha Tinh city and Loc Ha district, Ha Tinh province according to the multi-split-multiple connection (MDMC) scheme.

Kế hoạch lựa chọn nhà thầu tư vấn Các công trình: Xây dựng mạch vòng 22kV giữa TBA 110kV Linh Cảm (E18.2) và TBA 110kV Hương Sơn (E18.7), nâng cao độ tin cậy cung cấp điện khu vực huyện Hương Sơn, huyện Đức Thọ; Nâng cao độ tin cậy cung cấp điện của lưới điện trung áp khu vực thành phố Hà Tĩnh và huyện Lộc Hà, tỉnh Hà Tĩnh theo phương án đa chia - đa nối (MDMC).
Invitation for Bids
20220765203 - 00
Vietnam
25 Jul 2022
10 Aug 2022
Vietnamese
Substation equipment , Power supply accessories , Medium-voltage equipment

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Supply, transportation and installation of 110kV substation equipment - 9000122 Vietnam Supply, transportation and installation of 110kV transformer - 110kV transmission line and substation, My Thuan Industrial Park, Nam Dinh province - 7999527 Vietnam Supply, transportation and installation of 110kV transformer - 110kV Dong Coi Transmission Line and Substation, Nam Dinh Province - 7999557 Vietnam Supply, transportation and installation of 110kV transformer station equipment - 110kV Power Line and Substation Nam Thanh Pho, Lao Cai Province - 7999533 Vietnam Improving the power supply capacity of low-voltage grid in Vinh Ninh village in 2026 - Construction - 2000906 Vietnam Renovating outdoor protection control cabinets and AC-DC cabinets, completing the computer control system at Tan Quy 110kV substation - Construction and supply of materials and equipment for the project "Renovation of outdoor control and pr… - 2000691 Vietnam 110kV line supplying power to Yen Phong 110kV substation, Bac Ninh provinceSurvey, prepare construction drawings and construction drawings - 2000841 Vietnam Package 04 – 26 “Medium voltage equipment and accessories of all kinds” - Package 04 – 26 “Medium voltage equipment and accessories of all kinds” - 2000824 Vietnam Increasing capacity of T1 transformer of 110kV Dien Bien substation, Dien Bien province - Supply, transportation and installation of 110kV transformer - 2000810 Vietnam Improving the power supply capacity of the low-voltage grid in the wards of Dinh Cong, Tuong Mai, Giap Bat, Thinh Liet, Hoang Liet, Linh Nam, Mai Dong in Hoang Mai district in 2026 - Construction - 2000753 Vietnam
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans