loader

World Tenders & Procurement Opportunities

Construction and rehabilitation of water mains VU-1 to VU-3 and WDC VU-3 & Chinor

World Biggest Tenders Source

This tender with title Construction and rehabilitation of water mains VU-1 to VU-3 and WDC VU-3 & Chinor --
• Experience in the following key activities:
o Construction of 3 reinforced concrete tanks of pure water with a minimum capacity at least 500 m3 within last five years
o Construction of 2 water pumping station with a capacity of each not less than 700m3/h within last five years
o Construction of water networks/distribution system of non-metallic pipes with diameter 25 - 300 mm, with a total length of not less than 150 km completed within last five years.
has been published on Bidding Source portal dated 23 Nov 2022 for the country of Uzbekistan. It has been categorized on Construction work for water projects & Water-main refurbishment construction work & Works related to water-distribution pipelines. For similar tenders you can see tenders mentioned below of this page.


• Experience in the following key activities:
o Construction of 3 reinforced concrete tanks of pure water with a minimum capacity at least 500 m3 within last five years
o Construction of 2 water pumping station with a capacity of each not less than 700m3/h within last five years
o Construction of water networks/distribution system of non-metallic pipes with diameter 25 - 300 mm, with a total length of not less than 150 km completed within last five years.

General Information

Construction and rehabilitation of water mains VU-1 to VU-3 and WDC VU-3 & Chinor

• Experience in the following key activities:
o Construction of 3 reinforced concrete tanks of pure water with a minimum capacity at least 500 m3 within last five years
o Construction of 2 water pumping station with a capacity of each not less than 700m3/h within last five years
o Construction of water networks/distribution system of non-metallic pipes with diameter 25 - 300 mm, with a total length of not less than 150 km completed within last five years.
Invitation for Bids
Uzbekistan
23 Nov 2022
1 Dec 2022
English
Construction work for water projects , Water-main refurbishment construction work , Works related to water-distribution pipelines

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Construction and rehabilitation of WDCs and water mains in Chinaz district (174 km) - 05002 -- <h6>3782-UZB: Second Tashkent Province Water Supply Development Project [TP-CW-08] [Corrigendum 1]</h6> Uzbekistan Awarded - Design services for the sub-project Reconstruction of the water supply system of settlements included in the Karnaychi MCA, Soybuyi MCA, Eshonguzar MCA, Balandmasjid MCA of the Kushtepa district of the Fergana region - Uzbekistan -- <b>Contract Value: UZS 467046000.00</b> Uzbekistan Awarded - Design services for the subproject Reconstruction of the drinking water supply system for the settlements included in the Karmak MCA, Kaldushon MCA of the Furkat district of the Fergana region - Uzbekistan -- <b>Contract Value: UZS 310248000.00</b> Uzbekistan Awarded - Design services for subproject Reconstruction of the drinking water supply system for settlements included in the Kizilarik MCA, Kattaboltakul MCA, Kushtepa district of the Fergana region - Uzbekistan -- <b>Contract Value: UZS 512000000.00</b> Uzbekistan Awarded - Design services for the subproject Reconstruction of the drinking water supply system for settlements included in Nurafshon MCA, Kayragoch MCA, Yuldashobod MCA, Kushtepa district of Ferghana region - Uzbekistan -- <b>Contract Value: UZS 462000000.00</b> Uzbekistan Construction and rehabilitation of WDCs and water mains in Chinaz district (174 km) - 03955 -- <h6>3782-UZB: Second Tashkent Province Water Supply Development Project [TP-CW-08]</h6> Uzbekistan Awarded - Carrying out design and survey work and developing a working project turnkey for the facility Improvement of drinking water supply systems 23.7 km for the population of the MCA Bog Yangikurgan district - Uzbekistan -- <b>Contract Value: UZS 195110000.00</b> Uzbekistan Awarded - Carrying out design and survey work and developing a working project turnkey for the facility Improvement of drinking water supply systems 35.7 km for the population of MCA Gulshan Yangikurgan district - Uzbekistan -- <b>Contract Value: UZS 295667000.00</b> Uzbekistan Construction and rehabilitation of WDCs and water mains in Chinaz district (107 km) - 02659 -- <h6>3782-UZB: Second Tashkent Province Water Supply Development Project</h6> Uzbekistan WU-CW-09: Extension of Takhiatash WTP - 07311 -- <h6>3659-UZB: Western Uzbekistan Water Supply System Development Project</h6> Uzbekistan
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans