FOURNITURE DES PIECES DE RECHANGE POUR LA MAINTENANCE DES AEROGENERATEURS DES CENTRALES EOLIENNES DE KCHABTA, METLINE ET SIDI-DAOUD.

World Biggest Tenders Source

This tender with title FOURNITURE DES PIECES DE RECHANGE POUR LA MAINTENANCE DES AEROGENERATEURS DES CENTRALES EOLIENNES DE KCHABTA, METLINE ET SIDI-DAOUD. --
SUPPLY OF SPARE PARTS FOR THE MAINTENANCE OF WIND GENERATORS FOR WIND POWER PLANTS IN KCHABTA, METLINE AND SIDI-DAOUD.
has been published on Bidding Source portal dated 12 Dec 2022 for the country of Tunisia. It has been categorized on Parts of electric motors, generators and transformers & Parts for electrical motors and generators & Repair and maintenance services of generators & Generators & Construction work for power plant & Construction works for power plants and heating plants. For similar tenders you can see tenders mentioned below of this page.


SUPPLY OF SPARE PARTS FOR THE MAINTENANCE OF WIND GENERATORS FOR WIND POWER PLANTS IN KCHABTA, METLINE AND SIDI-DAOUD.

General Information

FOURNITURE DES PIECES DE RECHANGE POUR LA MAINTENANCE DES AEROGENERATEURS DES CENTRALES EOLIENNES DE KCHABTA, METLINE ET SIDI-DAOUD.

SUPPLY OF SPARE PARTS FOR THE MAINTENANCE OF WIND GENERATORS FOR WIND POWER PLANTS IN KCHABTA, METLINE AND SIDI-DAOUD.
Invitation to Bids
22 P 1063
Tunisia
12 Dec 2022
24 Jan 2023
French
Parts of electric motors, generators and transformers , Parts for electrical motors and generators , Repair and maintenance services of generators , Generators , Construction work for power plant , Construction works for power plants and heating plants

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Repair work on the seawater pumping station at the SOUSSE B power plant. - 24 E 4010 Tunisia Awarded - Recruitment of a firm responsible for controlling and supervising the solar power plant construction works market and the rural electrification works market - OP00281246 -- <b>Contract Value: TND 7894.6</b> Tunisia Acquisition and installation of an emergency generator and upgrade of the TGBT at the Aziza Othmana hospital. Tunisia AAO - Tunisia - Integration of electricity transmission network stations into the telecontrol system - PAERTE -- <h6>Lot No. 1: Telecontrol equipment. The execution time for batch No. 1 is fixed at 16 months (i.e. 480 days). Lot No. 2: Remote transmission equipment. The duration of execution of batch No. 2 is set at 16 months (i.e. 480 days).</h6> Tunisia Acquisition, transport, installation and start-up with tests of an inductively coupled plasma optical emission spectrometry with an autosampler, hydride generator and a computer system at th… Tunisia Acquisition of small and large flow auxiliary steam expansion and desuperheating valves and spare parts for bypass valve for the Sousse Combined Cycle Power Plant. -- <h6>Acquisition de vannes de détente et désurchauffe vapeur auxiliaire petit et grand débit et pièces de rechange pour vanne de contournement pour la Centrale Cycle Combiné Sousse.</h6> Tunisia Development of: Hazard Study of the TAC Goulette 2 Power Plant (lot 1) / Hazard Study of the Thyna Center (lot 2) / Hazard Study of the Fériana Center (lot 3) / Internal Operations… -- <h6>Élaboration de: Étude De Dangers de la Centrale TAC Goulette 2 (lot 1) / Étude De Dangers du Centre de Thyna (lot 2) / Étude De Dangers du Centre de Fériana (lot 3) / Plan d’Opérations Internes du Centre à Cycle Combiné de Ghannouch (lot 4) / Plan d’Opérations Internes de la Centrale de Bouchemma (lot 5) / Plan d’Opérations Internes du Groupement de Production de Sousse (étapes A, B, C et D) (lot 6) / Plan d’Opérations Internes du Centre de Bir M’Cherga (lot 7) / Étude de Dépollution Environnementale du Centre de Thyna (lot 8) / Étude de Dépollution Environnementale du Centrale de Fériana (lot 9) / Actualisation de l’Étude de Dangers de la centrale du Groupement de Production de Rades (étapes A et B) (lot 10) / Actualisation de l’Étude de Dangers du Groupement de Production de Sousse (étapes A, B, C et D) (lot 11) / Actualisation de l’Étude de Dangers du Centre à Cycle Combiné de Ghannouch (lot 12).</h6> Tunisia Tunisia - the design and turnkey construction of two photovoltaic power plants mounted on the ground and connected to the STEG network, on the sites o… Tunisia Tunisia - Maintenance of Transformation Stations and the Generator Group. Tunisia Tunisia - Supply and commissioning of a steam generator. Tunisia
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans