loader

World Tenders & Procurement Opportunities

Poland - CONDUCTING PRE-IMPLEMENTATION MONITORING IN THE SCOPE OF (...) THE PROJECT CONSTRUCTION OF A BARRAGE ON THE VISTULA BELOW WŁOCŁAWKA IN LOKAL.SIARZEWO

World Biggest Tenders Source

This tender with title Poland - CONDUCTING PRE-IMPLEMENTATION MONITORING IN THE SCOPE OF (...) THE PROJECT CONSTRUCTION OF A BARRAGE ON THE VISTULA BELOW WŁOCŁAWKA IN LOKAL.SIARZEWO --
„PROWADZENIE MONITORINGU PRZEDREALIZACYJNEGO W ZAKRESIE (...) PRZEDSIĘWZIĘCIA PN "BUDOWA STOPNIA WODNEGO NA WIŚLE PONIŻEJ WŁOCŁAWKA W LOKAL.SIARZEWO"
has been published on Bidding Source portal dated 06 Apr 2023 for the country of Poland. It has been categorized on Environmental Impact Assessment (EIA) services for construction. For similar tenders you can see tenders mentioned below of this page.


„PROWADZENIE MONITORINGU PRZEDREALIZACYJNEGO W ZAKRESIE (...) PRZEDSIĘWZIĘCIA PN "BUDOWA STOPNIA WODNEGO NA WIŚLE PONIŻEJ WŁOCŁAWKA W LOKAL.SIARZEWO"

General Information

Poland - CONDUCTING PRE-IMPLEMENTATION MONITORING IN THE SCOPE OF (...) THE PROJECT CONSTRUCTION OF A BARRAGE ON THE VISTULA BELOW WŁOCŁAWKA IN LOKAL.SIARZEWO

„PROWADZENIE MONITORINGU PRZEDREALIZACYJNEGO W ZAKRESIE (...) PRZEDSIĘWZIĘCIA PN "BUDOWA STOPNIA WODNEGO NA WIŚLE PONIŻEJ WŁOCŁAWKA W LOKAL.SIARZEWO"
Invitation for Bids
2023/S 065-192003
Poland
Poland-Warsaw
6 Apr 2023
12 Apr 2023
English
Environmental Impact Assessment (EIA) services for construction

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Preparation of a draft forest management plan together with a nature conservation program and a forecast of the impact of the plan on the environment and Natura 2000 areas for 9 forest districts - in force from 2027 - 668964 Poland Performing investor supervision over the design and implementation of the task: "Design and construction of devices limiting the acoustic impact on the environment of sections of the S7 and S8 roads, divided into sections: Section 1: S7 from the end of the Radom bypass to the border of the Mazovian Voivodeship; Section 2: S8 from Radziejowice to the border of the Mazovian Voivodeship, with the replacement of window joinery in a residential building" Poland Supervision of construction work - Performing investor supervision over the design and implementation of the task: "Design and construction of devices limiting the acoustic impact on the environment of sections of the S7 and S8 roads, divided into sections: Section 1: S7 from the end of the Radom bypass to the border of the Masovian Voivodeship; Section 2: S8 from Radziejowice to the border of the Masovian Voivodeship, with replacement of window joinery in a residential building Poland Noise control services – Post-implementation analyzes of the environmental impact of completed projects involving the construction of the S61 expressway, divided into tasks - 246748-2024 Poland Market research services – Preparation of the study "Forecast of the environmental impact of the draft Development Strategy of the Lower Silesian Voivodeship 2030+" - 191552-2024 Poland Poland – Feasibility study, advisory service, analysis – Preparation of a Feasibility Study (together with CBA) together with a Report on the environmental impact of the project, a Report on the disposal of spoil into the sea and auxiliary studies for the Investment entitled "Conducting works to enable water transport to the Outer Port in Świnoujście." - 86585-2024 Poland Feasibility study, advisory service, analysis - Preparation of a Feasibility Study (together with CBA) together with a Report on the environmental impact of the project, a Report on the disposal of spoil into the sea and auxiliary studies for the Investment entitled "Conducting works to enable water transport to the Outer Port in Świnoujście." - 86585-2024 Poland Environmental impact assessment for construction - Post-investment monitoring of the task "Modernization of the entrance to the inner port (in Gdańsk). Stage IIIA” - 65943-2024 Poland Preparation of a draft forest management plan for the period 2026 - 2035 for the Mińsk, Siedlce, Sokołów Forest Districts, along with a forecast of the plan's impact on the environment Poland Preparation of a Feasibility Study (together with CBA) together with a Report on the impact of the project on the environment, a Report on the disposal of spoil into the sea and auxiliary studies for the Investment entitled Carrying out works to enable water transport to the Outer Port in Świnoujście. Poland
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans