Syria - Rehabilitating the Electricity Grid to Power Al-Shari’eyeh Substation in Arbin a

World Biggest Tenders Source

This tender with title Syria - Rehabilitating the Electricity Grid to Power Al-Shari’eyeh Substation in Arbin a has been published on Bidding Source portal dated 14 Sep 2023 for the country of Syria. It has been categorized on Substation construction work. For similar tenders you can see tenders mentioned below of this page.

General Information

Syria - Rehabilitating the Electricity Grid to Power Al-Shari’eyeh Substation in Arbin a
Invitation for Bids
Syria
14 Sep 2023
21 Sep 2023
English
Substation construction work

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

REHABILITATION OF AL KHAFSEH SUBSTATION - 06770 Syria انشاء حوامل معدنية للكابلات في قناة مخارج الكابلات لمحطة تحويل سمريان -- Construction of metal holders for cables in the cable exit channel of Simrian substation Syria 14502/2020 - Carrying out the necessary works to repair the 66 KV tension line (Al-Sakhour - Aleppo C - Aleppo N) to feed the Aleppo substation (66/20) kV from Sakhour station -- نفيذ الاعمال اللازمة لإصلاح خط التوتر 66ك.ف (الصاخور –حلب ج- حلب ن وذلك لتغذية محطة تحويل حلب ن(66/20 )ك.ف من محطة الصاخور Syria 14481/2020 - for the project for the maintenance and rehabilitation of substations R1, M4, M3, M1, transmission centers, electrical networks and lighting networks in the industrial city of Aleppo -- <td width="150" align="right" dir="rtl"> لمشروع صيانة وتأهيل محطات التحويل R1,M4,M3,M1والمراكز التحويلية والشبكات الكهربائية وشبكات الانارة في المدينة الصناعية بحلب</td><td width="100" align="left"> </td> Syria Internal tender by joining or downloading method according to the following data: Executing civil works to expand a new substation Artouz 20/66 k. Q by adding a transformed cell 66/20 kV and expanding the 20 kV building in Damascus countryside. -- <td width="150" align="right" dir="rtl"> 14471/2020 -- مناقصة داخلية بطريقة الضم أو التنزيل وفق البيانات التالية : تنفيذ الأعمال المدنية لتوسيع محطة تحويل جديدة عرطوز 66/20 ك.ف بإضافة خلية محولة 66/20 ك.ف وتوسيع مبنى 20 ك.ف بمحافظة ريف دمشق </td><td width="100" align="left"> </td> Syria 14450/2020 - Maintenance, equipping and testing of the 66 kV / 20 kV transformer of / 30 / megawatt capacity with its connection and all that is required, and the provision, installation and connection of a 20 / kV / 0.4 kV ground transformer of / 160 / kV capacity for a project Maintenance and rehabilitation of substation (M4) -- 14450/2020 -- صيانة و تجهيز واختبار المحولة 66ك.ف/20 ك.ف استطاعة /30/ ميغا واط مع وصلها وكل مايلزم وتقديم وتركيب وتوصيل محولة تأريض 20/ك.ف/0.4 باستطاعة /160/ك.ف.أ لمشروع صيانة و إعادة تأهيل محطة التحويل(M4) Syria the diversion of 60kV line no. 51 and the rehabilitation of 60kV line no. 525 in front of the 225/60 kV OUJDA substation - 09306 Morocco High Speed ​​Link between Kenitra and Marrakech Construction of 3KV substations and remote control of electrical equipment - Lot 1: Construction of new traction substations for electrified tracks in 3KV; - Lot 2: Transformation of… - 06208 Morocco 60kV reinforcement of the 60/20kV substation « FNIDEQ AMENDMENTS » - 04663 Morocco T56PR25206 - T56PR25206-LIPPINCOTT SUBSTATION REPLACEMENT OF RECTIFIER TRANSFORMER – RT2 - 09193 Canada
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans