loader

World Tenders & Procurement Opportunities

AAO - Tunisia - Integration of electricity transmission network stations into the telecontrol system - PAERTE

World Biggest Tenders Source

This tender with title AAO - Tunisia - Integration of electricity transmission network stations into the telecontrol system - PAERTE --

Lot No. 1: Telecontrol equipment. The execution time for batch No. 1 is fixed at 16 months (i.e. 480 days). Lot No. 2: Remote transmission equipment. The duration of execution of batch No. 2 is set at 16 months (i.e. 480 days).
has been published on Bidding Source portal dated 10 Jan 2024 for the country of Tunisia. It has been categorized on Ancillary works for electricity power lines & Power tools & Construction work for power plant. For similar tenders you can see tenders mentioned below of this page.

Lot No. 1: Telecontrol equipment. The execution time for batch No. 1 is fixed at 16 months (i.e. 480 days). Lot No. 2: Remote transmission equipment. The duration of execution of batch No. 2 is set at 16 months (i.e. 480 days).

General Information

AAO - Tunisia - Integration of electricity transmission network stations into the telecontrol system - PAERTE
Lot No. 1: Telecontrol equipment. The execution time for batch No. 1 is fixed at 16 months (i.e. 480 days). Lot No. 2: Remote transmission equipment. The duration of execution of batch No. 2 is set at 16 months (i.e. 480 days).
Invitation for Bids
Tunisia
10 Jan 2024
29 Feb 2024
French
Ancillary works for electricity power lines , Power tools , Construction work for power plant

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Awarded - Recruitment of a firm responsible for controlling and supervising the solar power plant construction works market and the rural electrification works market - OP00281246 -- <b>Contract Value: TND 7894.6</b> Tunisia Request for bids No. 74/2024 for the project to complete the preparation of the electrical network at the Regional Hospital in Kef, media installment. Tunisia Integration of electricity transmission network stations into the telecontrol system - PAERTE -- <b>INTÉGRATION DES POSTES DU RÉSEAU DE TRANSPORT DE L’ÉLECTRICITÉ DANS LE SYSTÈME DE TÉLÉCONDUITE</b> Tunisia Acquisition of small and large flow auxiliary steam expansion and desuperheating valves and spare parts for bypass valve for the Sousse Combined Cycle Power Plant. -- <h6>Acquisition de vannes de détente et désurchauffe vapeur auxiliaire petit et grand débit et pièces de rechange pour vanne de contournement pour la Centrale Cycle Combiné Sousse.</h6> Tunisia Development of: Hazard Study of the TAC Goulette 2 Power Plant (lot 1) / Hazard Study of the Thyna Center (lot 2) / Hazard Study of the Fériana Center (lot 3) / Internal Operations… -- <h6>Élaboration de: Étude De Dangers de la Centrale TAC Goulette 2 (lot 1) / Étude De Dangers du Centre de Thyna (lot 2) / Étude De Dangers du Centre de Fériana (lot 3) / Plan d’Opérations Internes du Centre à Cycle Combiné de Ghannouch (lot 4) / Plan d’Opérations Internes de la Centrale de Bouchemma (lot 5) / Plan d’Opérations Internes du Groupement de Production de Sousse (étapes A, B, C et D) (lot 6) / Plan d’Opérations Internes du Centre de Bir M’Cherga (lot 7) / Étude de Dépollution Environnementale du Centre de Thyna (lot 8) / Étude de Dépollution Environnementale du Centrale de Fériana (lot 9) / Actualisation de l’Étude de Dangers de la centrale du Groupement de Production de Rades (étapes A et B) (lot 10) / Actualisation de l’Étude de Dangers du Groupement de Production de Sousse (étapes A, B, C et D) (lot 11) / Actualisation de l’Étude de Dangers du Centre à Cycle Combiné de Ghannouch (lot 12).</h6> Tunisia Tunisia - the design and turnkey construction of two photovoltaic power plants mounted on the ground and connected to the STEG network, on the sites o… Tunisia Tunisia - Integration of electricity transmission network stations into the telecontrol system - PAERTE Tunisia Tunisia - Tunisian Electricity Transmission Network Development Project, 13th Plan (September 2022 - May 2023) Tunisia Maintenance of primary schools Program 2022 - Maintenance of the electrical network - installment number 2 -- <h6>صيانة المدارس الابتدائية برنامج 2022 - صيانة الشبكة الكهربائية - القسط عدد2.</h6> Tunisia Tunisia - CONSTRUCTION OF A PREMISES TO SHELTER THE ROBOTS CLEANING THE SOLAR PANELS OF THE TOZEUR I AND II PHOTOVOLTAIC POWER PLANTS. -- <br><b>CONSTRUCTION D'UN LOCAL POUR ABRITER LES ROBOTS DE NETTOYAGE DES PANNEAUX SOLAIRES DES CENTRALES PHOTOVOLTAÏQUES DE TOZEUR I ET II.</b> Tunisia
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans