loader

World Tenders & Procurement Opportunities

Design and implementation of the modernization of the existing heating plant Zatore by building a high-efficiency cogeneration system for the task entitled Construction of a high-efficiency biomass cogeneration source with a capacity of 2.4 MWe and 10 MWt in Leszno / MPEC in Leszno - 297978-2024

World Biggest Tenders Source

This tender with title Design and implementation of the modernization of the existing heating plant Zatore by building a high-efficiency cogeneration system for the task entitled Construction of a high-efficiency biomass cogeneration source with a capacity of 2.4 MWe and 10 MWt in Leszno / MPEC in Leszno - 297978-2024 has been published on Bidding Source portal dated 28 May 2024 for the country of Poland. It has been categorized on Construction works for power plants and heating plants. For similar tenders you can see tenders mentioned below of this page.

General Information

Design and implementation of the modernization of the existing heating plant Zatore by building a high-efficiency cogeneration system for the task entitled Construction of a high-efficiency biomass cogeneration source with a capacity of 2.4 MWe and 10 MWt in Leszno / MPEC in Leszno - 297978-2024
Invitation for Bids
Poland
28 May 2024
19 Jun 2024
English
Construction works for power plants and heating plants

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Construction of a high-efficiency gas cogeneration source with a capacity of 4.3 MWe at the C1 Heating Plant, together with the accompanying infrastructure - 6785123 -- <b>Contract Value: 34 500 000,00 PLN</b> Poland Construction of a zone heat source with a nominal power of 20 MW, consisting of a gas boiler with a nominal power of 12 MW and a cogeneration system on premises of University - 6785122 Poland Construction of 300 MWt electrode boilers and a 52,000 m3 net heat accumulator with auxiliary infrastructure at PGE Energia Ciepła SA Wybrzeże Branch in Gdańsk - 84458822 Poland Construction of generation sources based on gas and electrode water boilers for the Wrocław Combined Heat and Power Plant Complex KOGENERACJA SA - 5096775 Poland Construction of a high-efficiency gas cogeneration source with a capacity of 4.3 MWe at the C1 Heating Plant, together with the accompanying infrastructure - 8474971 -- 34 500 000,00PLN Poland Construction of new generating units with a heat accumulator at the Zawidawie CHP plant - 601043 Poland Construction of 300 MWt electrode boilers and a 52,000 m3 net heat accumulator with auxiliary infrastructure at PGE Energia Ciepła SA Wybrzeże Branch in Gdańsk - 577120 Poland Construction of a two-stage economizer in the form of a heat recovery system with a heat pump on the K5 boiler exhaust system. - 548570 Poland Construction works for power plants and heating plants – Construction of a two-stage economizer in the form of a heat recovery system with a heat pump on the exhaust system of the K5 boiler. - 513333 Poland Construction works for power plants and heating plants – Construction of new generating units with a heat accumulator at the Zawidawie CHP plant - 506026 Poland
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans