loader

World Tenders & Procurement Opportunities

Construction of RRM Retaining Wall with Anchored RCC Toe Wall at Ch. 26.00 Km on Rinchending-Pasakha-Manitar PNH under Monsoon Works - 07365

World Biggest Tenders Source

This tender with title Construction of RRM Retaining Wall with Anchored RCC Toe Wall at Ch. 26.00 Km on Rinchending-Pasakha-Manitar PNH under Monsoon Works - 07365 has been published on Bidding Source portal dated 04 Feb 2025 for the country of Bhutan. It has been categorized on Bricklaying work & Masonry and bricklaying work & Masonry work. For similar tenders you can see tenders mentioned below of this page.

General Information

Construction of RRM Retaining Wall with Anchored RCC Toe Wall at Ch. 26.00 Km on Rinchending-Pasakha-Manitar PNH under Monsoon Works - 07365
Invitation to Tender
Bhutan
4 Feb 2025
English
Bricklaying work , Masonry and bricklaying work , Masonry work

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Construction of RCC Culvert and Retaining Wall at Housing colony - 6773878 Bhutan Construction of Boxcut Bypass from Tsachu Top - Jigmecholing (Ch. 9.2 - 19.314 km), Package II. Works consists of: 1. Earthworks (Formation cutting & Embankment) 2. Permanent works (Retaining walls, Brest walls, and Gabion walls) 3. Drainage works (V-drain and U-drain) and Cross-drainages for irrigation purposes .. - 7866882 Bhutan Improvement of Yongkola-Lingmethang PNH, Package-1 (0-10.81 km): The scope of the project includes: - Widening and embankment construction, - Pavement works (Dismantling of existing BT, Subgrade preparation, GSB, WMM, AC and DBM) - Permanent Works (V & Retaining Wall) - Cross drainage (RCC Slab Culverts) - Protective works (Gabion wall, RRM breast wall & installation of crash barriers) - 7866990 Bhutan Two (02) Construction of Boxcut Bypass from Tsachu Top - Jigmecholing (Ch. 9.2 - 19.314 km), Package II. Works consists of: 1. Earthworks (Formation cutting & Embankment) 2. Permanent works (Retaining walls, Brest walls, and Gabion walls) 3. Drainage works (V-drain and U-drain) and Cross-drainages for irrigation purposes... - 07116 Bhutan HIRING OF CONSULTANCY SERVICES-TOPOGRAPHICAL SURVEY,CROSS SECTION DETAILING AND QUANTIFICATION OF EARTH CUT AND FILL VOLUMES FOR THE CONSTRUCTION OF THREE LANE ROAD, RETAINING WALL,BOUNDARY WALL AND TO PREPARE A MASTER PLAN WITHIN 3.21 ACRES OF LAND ALIGNED WITH EXISTING ROUGH SKETCH MASTER PLAN OF PIU. - 06654 Bhutan Construction of Boxcut Bypass from Tsachu Top - Jigmecholing (Ch. 9.2 - 19.314 km), Package II. Works consists of: 1. Earthworks (Formation cutting & Embankment) 2. Permanent works (Retaining walls, Brest walls, and Gabion walls) 3. Drainage works (V-drain and U-drain) and Cross-drainages for irrigation purposes 4. Two Bridge works (30 m PSC & 55 m Steel Girder) and Slab culverts (3x3: 38 nos; 4x3.5: 14 nos; and 5x4: 11 nos) 5. Pavement works (Subgrade preparation, Shoulder, Sub-base, GSB, WMM, DBM & AC) 6. Road furniture & Traffic safety measures 7. Countermeasures & Bio-engineering works 8. Establishment of Two Residential houses and hiring of pool vehicle - 07982 Bhutan Construction of Retaining Wall and Electrical Maintenance Work, Dagana - 09180 Bhutan Hollow block masonary, RRM, Steel Works, Solid Block Masonary - 03136 Bhutan Construction of RRM Retaining Wall with anchored RCC Toe Wall at Ch. 24.70 Km on Rinchending-Pasakha-Manitar PNH under Monsoon Restoration Works - 07364 Bhutan Construction of retaining wall and Gabion wall along the Geney Rongchu irrigation channel - 04049 Bhutan
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans