loader

World Tenders & Procurement Opportunities

565891- Romania – Hydro-electric plant construction work – "Execution of works for the rehabilitation and modernization of the micro-hydropower plant with an installed capacity of 9.9 MW from SE Turceni, including the development of technical documentation and the supply of equipment/installations"

World Biggest Tenders Source

This tender with title 565891- Romania – Hydro-electric plant construction work – "Execution of works for the rehabilitation and modernization of the micro-hydropower plant with an installed capacity of 9.9 MW from SE Turceni, including the development of technical documentation and the supply of equipment/installations" has been published on Bidding Source portal dated 31 Aug 2025 for the country of Romania. It has been categorized on Hydro-electric plant construction work. For similar tenders you can see tenders mentioned below of this page.

General Information

565891- Romania – Hydro-electric plant construction work – "Execution of works for the rehabilitation and modernization of the micro-hydropower plant with an installed capacity of 9.9 MW from SE Turceni, including the development of technical documentation and the supply of equipment/installations"
Invitation for Bids
565891
Romania
31 Aug 2025
1 Oct 2025
English
Hydro-electric plant construction work

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

425962- Romania – Hydro-electric plant construction work – "Execution of works for the rehabilitation and modernization of the micro-hydropower plant with an installed capacity of 9.9 MW from SE Turceni, including the development of technical documentation and the supply of equipment/installations" Romania Execution of works for the rehabilitation and modernization of the microhydropower plant with an installed capacity of 9.9 MW from Turceni HPP, including the development of technical documentation and the supply of equipment/installations - 38637 Romania Execution of works for the rehabilitation and modernization of the microhydropower plant with an installed capacity of 9.9 MW from Turceni HPP, including the development of technical documentation and the supply of equipment/installations - 746043 Romania RETEHNOLOGIZARE CHE BRĂDIŞOR -- Hydro-electric plant construction work Romania Retehnologizare CHE Râul Mare Retezat -- Hydro-electric plant construction work Romania CONTROL AND MONITORING OF GENERAL MAINTENANCE SERVICES FOR TURBINE ALTERNATOR GROUPS AND 6.3/110KV STEP-UP AND 110/30KV STEP-DOWN TRANSFORMERS IN SERVICE IN THE MEKIN HYDROELECTRIC DEVELOPMENT. - 7784541 Cameroon Maintenance of electrical, hydroelectric, air conditioning installations and operating equipment of the South and West regional directorates of the National Motorway Company of Morocco - 7785134 Morocco MAINTENANCE OF TURBINE ALTERNATOR GROUPS AND 6.3/110KV STEP-UP AND 110/30KV STEP-DOWN TRANSFORMERS IN SERVICE IN THE MEKIN HYDROELECTRIC DEVELOPMENT The following is provided to the above-mentioned Call for Tenders Documents. - 7785146 Cameroon Carrying out work on the current repair of metal structures and supporting and running parts of the working gate No. 1 of the spillway dam of the Voronezh hydroelectric complex for the needs of the Verkhne-Donskoy RVPiS - a branch… - 77837832 Russia Rehabilitation of the Wau Micro-Hydroelectric Power Station and associated networks in the Masisi territory, North Kivu Province - 7837512 Congo, DR
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans