Construction contractor selection plan: To treat and reinforce the upstream, downstream canal and Cau Dong sluice gate (K1 + 000) on Thanh Lang B main drainage canal
Project contractor selection plan: To handle the landslide of the Minh Hoa middle-water canal bank, downstream of the Na sluice gate (dyke on the copper side, left dike Kinh Mon), Minh Hoa commune
KHLCNT, works Renovation and repair of Dormitory B1 in 2021 Hanoi College of Electrical Engineering and Food Technology; Item: Paint inside and outside the house, replace door system and electric system