Construction contractor selection plan: New construction, renovation of medium-low voltage grid and substation of Ba Ria city, Ba Ria-Vung Tau province by 2020
KHLCNT Replace the transformer T1 40MVA of Quynh Luu 110kV substation with the 40MVA - 110/35 / 22kV transformer (the 22kV side is connected with the star) and complete the diagram on the 22kV side