Contractor selection plan. Project: Increasing cross section of medium voltage line Hong Thap branch, Bao Vinh A branch (Section from Pillar 100 to 183) - Long Khanh city - year 2021
Contractor selection plan. Project: Newly building rural medium voltage grid for concentrated agricultural production in the city. Long Khanh 2019-2020
Relocating and upgrading medium voltage power lines in the 972E15.4 transmission line, 0.4kv low-voltage power line serving site clearance and new construction of 0.4kv power lines, lighting electricity, paving pavement, water supply for daily life land plot division project in the area of Block 5 Garden, Do Luong town, Do Luong district
Technical infrastructure for new residential points in the North of HL5B, Cam Ly village and Hoang Giap village, An Lam commune, Nam Sach district, Hai Duong province; Category: Moving and renovating the 35KV medium voltage line from column 58 to 66 - Highway 374 - E8.16 serving site clearance for the new residential area in the North
The second contractor selection plan for the project "Overhaul of medium voltage grid fixed assets - replacement of wires and accessories for Huu Loi, Tu Khoa, Thanh Khiet, Khiem Khai and Ba Lat lines" < / td>
KHLCNT Package No. 01: Investigating, measuring and collecting data; Construction investment and construction investment report Construction: XDM a medium voltage line inside Dau Giay Industrial Park supplying power to LongWell Company - Thong Nhat District
29 Apr 2021
18 May 2021
Vietnam
Invitation for Bids
Vietnamese
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center,
Bakirkoy - Istanbul - Turkey