approves the contractor selection plan for the project: Upgrading the medium and low voltage transmission line in Xuan Loc district by 2020 to prevent overloading in Xuan Tam commune, Xuan Hoa, Xuan Truong, Gia Ray town.
approved the contractor selection plan for the project: Upgrading the medium-low voltage line, transplanting the transformer station in Xuan Phu, Xuan Tho, Bao Hoa, Xuan Bac communes in 2020 (Additional)
Contractor selection plan. Project: Upgrading medium and low voltage grid and 1-phase substations to 3 phases in Bao Quang commune, Xuan Lap ward, Bao Vinh ward - Long Khanh city in 2021
Contractor selection plan. Project: Development of low voltage lines to prevent overloading of wires, reduce power loss in the city area. Long Khanh year 2021
Overhaul fixed low-voltage grid assets, replace and improve damaged, low-voltage distribution cabinets and Replace pillars, ABC cables and accessories in 14 areas by 2021